SDS were appointed by the client as part of a £7.8 million site wide update, including the repositioning of a process line and an expansion to the existing building
The area of works covered 2,980m2 inside an 8m height manufacturing building
The project consists of multiple phases of works, safely repositioning over 20 moulding machines each weighing between 20 to 2st
A detailed project programme was created to enable construction to take place whilst maintaining production in a clean and safe environment
Electrical enabling works on live switchgear was coordinated with designated shutdown periods
Special consideration for Health and Safety, and futureproofing of systems was incorporated into the design
Specialist fire aspirating system designed to cover all areas for early warning detection. High powered Visual Alarm Devices (VADs) specified for industrial environments with high
background sound levels
High and low voltage transformer upgrades, relocation works and high voltage grading studies.