150k redevelopment of BRI Phase 4 Works on level 5 of the Bristol Royal Infirmary (BRI)
Improvement to patient flow throughout the hospital by taking around 150 patients a week from wards in the BRI and BHI
Existing MEMO offices workshop remodelled to become a discharge lounge
The programme was of a short nature with SDS heavily involved throughout
Due to the fastrack nature many items, including pneumatic tube systems were ever changing
AC VRF, heat recovery system
LED lighting
Air tube system