Phase 1, a three-storey extension to the existing Hele Building at the main entrance of the Hele Road Campus. Providing a Digital & Data Centre as part of the South West Institute of Technology.
The 2400m² extension includes a central atrium joining the two buildings, with exhibition space and a digital wall.
A full refurbishment of the existing ground floor includes new T Level Teaching spaces, a Learning Resource Facility, Café and Careers and Outreach Support area.
The IoT extension comprises a Lecture Theatre and teaching spaces catering for up to 1,549 digital and data students.