598 student rooms arranged in a mixture of cluster flats, selfcontained studio flats, studios, accessible rooms, penthouses and duplexes. On the lower levels there will be a mix of shell only
retail, plant and associated student spaces, for example, main reception/communal space, and office space
In order to meet the Exeter Council targets set out, a modular CHP plant will be installed, which will generate approximately 677MWh of renewable energy each year and serve approximately
30% of the developments total regulated heating demand.
Detailed Site Survey, Detailed Design and Specification of the Building Engineering Mechanical & Electrical Services
Full and complete building engineering services design from concept through to technical design proposals, with production of specification, schedules, 2D detailed design layout drawings,
schematic arrangements and 3D model
Thermal overheating analysis to develop ventilation strategies for a densely populated space.
Early engagement with the BREEAM process allowing maximising realisation of BREEAM credits to work towards achieving Excellent accreditation
Controls strategy to maximise CHP utilisation
Working collaboratively as a part of an integrated design team providing our low carbon and building environmental expertise in order to deliver a sustainable building and realise a very good BREEAM rating demonstrating environmentally friendly options for both the design and on-going operation of the building
Reducing future carbon emissions by an estimated 18.6%
3D Revit modelling of services installation
Efficient MEP systems and controls that offer reliability and ease of maintenance.