New £50m pavilion and redevelopment of the site Mechanical and electrical
Services included:
Fire Alarm to L1 design category, complete with audible speech and phased evacuation strategy through cause and effect matrix
Boosted gas and water services to overcome distance between shore end and pavilion
Large sub-main supplies and controls to rides and attractions
Standby diesel generator and UPS for essential life systems
Compressed air system for operation of the rides and attractions
Architectural feature and stage lighting, complete with digital head-end PC providing complex lighting controls for management and energy saving.
SDS were employed to verify that the building services (mechanical and electrical) designs satisfied and included for all the client and end user requirements and that the design complied with all current legislations, standards and building control requirements.
Carried out full thermal modelling, annual energy estimates, overheating compliance.
SBEM calculations and EPC certification to prove Part L Building Regulations compliance.