Bletchley Rail Depot

Depot upgrade in preparation of arrival of new fleet from Network Rail.
Rail
Milton Keynes
£68m
2025

M&E Design consultancy for accommodation, office and welfare facilities, sidings, shed extension, car park & access areas

Bletchley Rail Depot was upgraded in preparation for the arrival of a new fleet of trains from Network Rail. To accommodate the new 5-car Class 730, enhancements throughout the station were required. SDS provided M&E design consultancy and building physics services for the project on behalf of Parker Technical Services, covering accommodation, office and welfare facilities, sidings, shed extension, car park, and access areas.

  • Full M&E design consultancy for accommodation, office and welfare facilities, electrified and non-electrified sidings, main shed extension, car park and access areas
  • We provided a review of existing Grip Stage 4 design proposal and shared our feedback
  • We delivered Grip stages 5 to 7, including coordinated detailed generic and detailed specific design works
  • We performed the role of the Contractors Responsible Engineer including submission of IDC and IDR forms for Network Rail project compliance
  • Our model was built in REVIT using BIM collaborate with everything, including externals, having been modelled in 3D – a first for a project of this kind
  • We ensured compliance with Part L
  • We provided BRUKL and Thermal Modelling alongside completion of the predicted and as built EPC rating

Get in touch

Your vision, our expertise – engineering a more sustainable world together.