9 Dock – HMNB Devonport

High-efficiency lighting and modular design supporting operational excellence at HMNB Devonport
Defence
Plymouth

A coordinated lighting and infrastructure upgrade to segregate vehicles and pedestrians across the dockyard to enhance safety and efficiency.

SDS provided design and technical support for the 9 Dock Vehicle and Pedestrian Segregation project at HMNB Devonport, enhancing safety, efficiency, and operational clarity across approximately 20,000 m² of external works. Commissioned by Babcock and delivered with Cavendish Nuclear Ltd, the scheme formed part of wider modernisation efforts to strengthen dockyard infrastructure. Working to RIBA Stage 4 – Technical Design, SDS developed a coordinated external lighting strategy optimised for the dock’s complex operational environment, ensuring efficiency, durability, and compliance with stringent defence standards while allowing flexibility for future upgrades.

  • Delivered RIBA Stage 4 Technical Design for external lighting systems.
  • Designed high-efficiency lighting and control systems to improve safety and energy performance.
  • Provided coordination and integration of MEP systems with existing site infrastructure.
  • Supported modular installation methods to reduce site disruption and optimise programme delivery.
  • Enhanced safety and operational efficiency through improved vehicle and pedestrian segregation.
  • Energy-efficient lighting design supporting reduced carbon footprint and lifecycle costs.
  • Modular systems approach enabling streamlined installation and maintenance.
  • Delivered programme acceleration while meeting specific sector design standards and operational priorities.

Get in touch

Your vision, our expertise – engineering a more sustainable world together.