University of West of England – Bower Aston

Centre of excellence providing high quality facilities
Education
Bristol
£1.6M
2025

The project created a new Open Access Learning Zone, an expanded refectory and bar area and a first floor library extension

A new £1.6m courtyard infill development, built by Kier under the SCAPE framework and completed in late 2014. The project created a new Open Access Learning Zone, an expanded refectory and bar area and a first floor library extension. Rehearsal and performance space was created for students relocating from St Matthias’s campus

  • SDS undertook the initial feasibility studies and developed the mechanical and electrical performance specifications for the refurbishment and extension of the existing ground and first floors
  • Works included site surveys, design team coordination, services strategy, load assessments, infrastructure review and planning for site diversions
  • The refurbishment extended power, lighting, heating, hot and cold water, and above and below-ground drainage services
  • Specialist systems included lightning protection, fire alarms and equipment, security, ventilation, voice and data. Full coordination was provided for specialist spaces and new and existing equipment
  • Proactive advice on compliance with relevant British Standards, CIBSE/BSRIA guidance and Building Regulations
  • Surveys of existing infrastructure to identify service interfaces and required upgrades, all within budget.
  • Infrastructure was designed to accommodate increased site loads, with consideration given to space and access constraints for services