Clacton Maintenance Depot

EXTERNAL LIGHTING PARKER TECHNICAL SERVICES
Rail
Clacton

Appointed to undertake a lighting design for the service footpaths to headshunt and facilitate wash areas.

SDS were appointed by Parker Technical Services to undertake a detailed external lighting design for the service footpaths to the headshunt and facility wash areas.

  • Greater Anglia introduced a new fleet of trains into service, consisting of two different manufacturers in a variety of classes
  • Detailed bollard lighting design and calculations
  • Liaising with the lighting manufacturer to design a bespoke flange plate for the proposed GRP footpath
  • Coordination with other disciplines including architectural, structural, civils, earthing specialists, and the appointed contractors
  • Selection and specification of all luminaries, controls, cabling, and supplies to serve the proposed areas
  • Delivered GRIP stages 3-5, including technical drawings, lighting strategy reports, schedules, calculations, and specifications.
  • High efficacy external lighting arrangement providing safe access for the maintenance team to carry out their tasks to service the train
  • Low-energy LED lighting with minimal upward light component to reduce sky-glow during night-time operations, reducing light spill and light pollution on site
  • All lighting calculations and designs were completed in accordance with Network Rail and Greater Anglia requirements and specification
  • Emergency lighting design for safe access and egress to the assembly points
  • Level crossing design with bespoke mounting flange to enable bollard integration within the handrail assembly, improving maintenance access.

Get in touch

Your vision, our expertise – engineering a more sustainable world together.