SDS was engaged by North Devon Healthcare NHS Trust to review existing building services infrastructure for proposed upgrades to Operating Theatres 1-4.

SDS was appointed to support the refurbishment of four Operating Theatres, Recovery Bay, and Staff accommodation within a five-storey hospital, delivering feasibility studies, infrastructure assessments, and coordinated design solutions, including a new rooftop plantroom, all in compliance with HTM/HBNstandards.

  • Delivered a RIBA Stage 2 report in support of the outline business case
  • The project involved refurbishment of four Operating Theatres, Recovery Bay, and Staff accommodation, along with construction of a new rooftop plantroom
  • Completed a Strategic Outline Case (SOC) to assess the feasibility of installing a temporary operating suite during refurbishment
  • Verified the performance of existing mechanical services to inform project phasing
  • Site services included plantrooms with air handling units, hot water generation systems, and a steam steriliser
  • Installed a new air-cooled chiller on the roof, with the external Energy Centre containing the main boiler and CHP plant.
  • Due to limited expansion space, the feasibility study focused on minimising service diversions and assessing existing infrastructure capacity
  • SDS carried out developed design and detailed coordination in collaboration with specialist equipment providers
  • Reviewed logistics for connecting to existing services and conducted utility surveys to assess capacity and lifespan
  • Ensured compliance with HTM/HBN standards for operating theatres.