Tiverton Endoscopy Unit

ENDOSCOPY FACILITY WITH LOW-CARBON SERVICES DESIGN
Healthcare
Tiverton

SDS supported the delivery of a new endoscopy unit through detailed MEP design, sustainability assessment, BIM coordination and construction-stage support.

The New Build Endoscopy Unit in Tiverton is a £6m healthcare project delivered with coordinated, low-carbon building services. SDS provided full mechanical, electrical and public health design, alongside BREEAM / DREAM assessment, performance specifications, BIM coordination and COBie asset tagging.

The building incorporates photovoltaic panels, high-efficiency lighting / controls and air source heat pumps serving heating, chilled water and domestic hot water production. The ASHP system uses a four-pipe arrangement, allowing rejected heat to be reused to improve system efficiency.

The project required careful coordination around limited electrical capacity, a protracted new supply application and a compressed commissioning period before occupation.

  • Delivered full mechanical, electrical and public health design
  • Supported BREEAM / DREAM assessment and performance specifications
  • Coordinated BIM information, COBie asset tagging and services data
  • Managed infrastructure diversions and electrical capacity constraints
  • Integrated ASHPs for heating, cooling and hot water
  • Improved efficiency through four-pipe heat recovery design
  • Included photovoltaic panels and efficient lighting controls
  • Supported handover with structured COBie asset information
  • Helped address infrastructure constraints through early services coordination.

Get in touch

Your vision, our expertise – engineering a more sustainable world together.