Weston Super Mare Pier

New £50m redevelopment of the pavilion
Public & Community
Weston Super Mare
£50m
2010

The Grand Pier project, the result of a competition winning design, was a rebuild of the previous 1903 Grade II listed pier virtually destroyed by fire in 2008.

The Grand Pier project represents a landmark £50 million redevelopment, transforming the site following the destruction of the original 1903 Grade II listed pier by fire in 2008. The project included the design and construction of a new pavilion and comprehensive site redevelopment, incorporating modern facilities while respecting the pier’s heritage.

SDS was commissioned to provide specialist verification of the mechanical and electrical (M&E) services, ensuring that all designs met client and end-user requirements, complied with current legislation, standards, and building control regulations.

  • SDS were employed to verify the building services (mechanical and electrical) designs.

  • Ensured all client and end-user requirements were satisfied and fully included in the designs.

  • Confirmed that the designs complied with all current legislation and standards.

  • Verified compliance with building control requirements.

  • Conducted full thermal modelling and annual energy consumption estimates.

  • Checked for overheating compliance.

  • Performed SBEM (Simplified Building Energy Model) calculations.

  • Produced EPC (Energy Performance Certificate) certification to demonstrate Part L Building Regulations compliance.